Yangzhong City Accelerates Distributed Photovoltaic Power Generation

Yangzhong City Accelerates Distributed Photovoltaic Power Generation

In order to conscientiously implement the government, provincial, and Zhenjiang policies to promote the development of the photovoltaic industry and accelerate the application of photovoltaics, accelerate the development of the photovoltaic industry in the city and the pace of construction of photovoltaic applications, promote the “Gold Roof” project, and strive to create “Green Energy Island”. , The following implementation opinions are proposed:

First, the overall idea

Focusing on the development goals of “Economically strong, ecologically friendly, people’s well-being, and social harmony”, we will make overall planning, rational distribution, demonstration, and orderly promotion, actively implement distributed photovoltaic power generation projects, further optimize energy consumption structure, and promote energy saving and reduction. Pai, promote the sustainable and healthy development of the photovoltaic industry in our city.

Second, the main objectives

Through the application of driving industry and industry to promote innovation and innovation to promote development, from 2015 to 2020, the city will build an annual installed capacity of 40 MW of distributed photovoltaic power generation; strive to install a total capacity of 240 MW by the end of 2020, and build an important PV research and development, manufacturing and Application demonstration base.

III. Work focus

1. Promote industrial plant roof photovoltaic power generation. Adhere to the principle of “self-use, surplus online, and power grid adjustment” and encourage the use of existing industrial plant construction roofs to build distributed photovoltaic power generation projects. Encourage the construction of new standardized plants in accordance with the overall design and construction of the BIPV standard. The various types of administrative fees involved in the project construction are based on the “Opinions on Further Accelerating the Construction of Development Zones and Industrial Concentration Zones” (Yangfa [2008] No. 12 )carried out. We will vigorously carry out large-scale application demonstrations and build demonstration parks for distributed photovoltaic power generation with various types of industrial parks with stable power loads and contiguous roof resources.

2. Promote the photovoltaic power generation on the rooftops of party and government agencies and public institutions. Administrative public centers, hospitals, schools, and other existing public buildings shall be planned, distributed and implemented in a unified manner, and market-oriented operation methods shall be adopted to encourage step-by-step implementation of rooftop power generation projects. Newly-built public buildings with a roof area of ​​1,000 square meters (including government-funded standardized factory buildings) must be designed and constructed in full accordance with the requirements for photovoltaic building integration. City planning, housing construction and other departments must strictly control to ensure that they are beautiful, safe, and practical. .

3. Promote residential PV application demonstration projects. Increase support to encourage and guide residents to participate in the construction of rooftop photovoltaic power plants and promote green and low-carbon lifestyles. Implement photovoltaic power plant poverty alleviation activities, raise social funds to select some impoverished households to install rooftop photovoltaic power stations free of charge, carry out new energy activities in communities, and select township neighborhoods to select some community residential sites for overall planning, unified promotion and unified construction, and build a batch of large-scale applications. Demonstration plots to improve the enthusiasm of all citizens to build photovoltaic power plants.

Fourth, support policy

1. Simplify the approval process. Distributed photovoltaic power generation projects shall be managed by the provincial Development and Reform Commission under the jurisdiction of the provincial government. The distributed photovoltaic power generation projects for residential households shall be submitted to Yangzhong Power Supply Company for registration and application for registration. The Urban Housing and Urban-Rural Development Bureau is responsible for compiling and promoting technical measures for integration of solar photovoltaic and building design and construction, establishing a solar photovoltaic project standard system, and standardizing project construction. The relevant functional departments of the Municipality provide convenient services for the project planning site selection, land use, environmental impact assessment, new photovoltaic product development and application, and so on.

2. Improve on-grid services. Implementation of the grid-connected photovoltaic power generation project grid management measures issued by the national and provincial grid companies, and optimization of grid-connected service processes. Strengthen the construction and transformation of photovoltaic power generation supporting power grids to ensure the synchronized design and simultaneous construction of supporting power grids and photovoltaic power generation projects. Strengthen the tracking service of grid-connected operation, actively develop and apply advanced micro-grid and smart grid technologies that integrate advanced energy storage technology and information technology, and improve the grid system's ability to accept photovoltaic power generation.

3. Supporting electricity subsidies. The municipal government has set up a 10 million yuan PV application industry investment fund, and newly established photovoltaic power generation projects for photovoltaic power generation companies registered in Yangzhong, and the use of local photovoltaic products accounted for 80% (inclusive) or more of the total investment in equipment (50%) ( In addition to the above, in addition to the State’s subsidy of RMB 0.42 per kilowatt-hour according to the policy, according to the actual electricity generation effect after the project is completed, the city’s finance will be given RMB 0.15/kWh and RMB 0.1/kWh subsidy respectively within the year’s amount. The period is tentatively set to be 2015~2017 (projects that enjoy special subsidies from the state or the province shall not be subject to repeated subsidies). The resident roof project subsidy is 0.3 yuan/kwh, and the subsidy period is 6 years. For the photovoltaic roof power generation projects that have been completed, 50% subsidies will be based on the new project standards.

4. Optimize settlement services. We will improve the measurement and statistics of power generation and grid-connected electricity generation for distributed photovoltaic power generation projects, and establish a two-way electricity tariff measurement information management system, in which the power supply enterprises will transfer monthly state subsidy funds. The local subsidy funds are regulated at a rate of 40 megawatts per year. They are first applied for first, and the first generation is subsidized first. The Municipal Development and Reform Commission and the Municipal Bureau of Finance audit the cash.

5. Increase financial support. To attract diverse investments, innovate in business models, actively promote PPP, contract energy management, and financial leasing, and guide social capital to participate in the construction of photovoltaic applications. Innovate financial products and services, guide financial institutions to increase credit support for photovoltaic companies and power plant projects, and encourage financial institutions to pledge power to the photovoltaic grid-connected power generation companies for the right to use power charges on the Internet and subsidies to be paid as their sources of repayment. stand by.

6. Strengthen energy conservation support. For new construction projects with an annual comprehensive energy consumption of more than 3,000 tons of standard coal and the construction of rooftop photovoltaic power generation conditions, the use of roof supporting photovoltaic power generation projects is in principle required. Self-use energy generation is included in the energy savings of local governments and users, and energy savings and carbon emissions trading income are included in the PV industry investment fund. For enterprises participating in the construction of distributed photovoltaic power generation projects, priority will be given to the implementation of the orderly power utilization plan according to their scale of power generation.

7. Fight for superior support. For eligible enterprises, actively strive for national and provincial supportive policies, prioritize support for reporting national and provincial support projects, and promote the construction of distributed photovoltaic power generation projects.

V. Safeguards

1. Strengthen organization leadership. Established the Leading Group of Photovoltaic Power Generation Promotion in Yangzhong City. The main leaders of the municipal government will be the team leader, the deputy leader will be in charge of the leadership, the Municipal Development and Reform Commission, the Finance Bureau, the Power Supply Company, the Science and Technology Bureau, the Housing and Construction Bureau, the Land and Resources Bureau, and the planning. The Bureau, the Environmental Protection Bureau, the Financial Office, the State Administration of Taxation, the Agency Affairs and Service Centers and the towns (streets and districts) are the member units that are responsible for the overall implementation of the organization and implementation of the city's photovoltaic power generation projects. Yangzhong City Photovoltaic Application Office (abbreviated as Photovoltaic Office) was established to be responsible for the interpretation and operation of this opinion.

2. Strengthen work implementation. The Photovoltaic Office will coordinate the promotion of distributed photovoltaic power generation. At the beginning of each year, the photovoltaic power generation project plan will be released, and enterprises and social capital will be ordered to invest in photovoltaic power generation. Actively create a development atmosphere, strengthen typical demonstrations, and promote coordinated development of photovoltaic power generation R&D, manufacturing, and application; Service coordination, supervise the project to complete power generation on schedule, timely organize assessments, and honor local subsidies.

3. Strengthen coordination and cooperation. All functional departments must earnestly fulfill their responsibilities, strengthen coordination and cooperation, and work together to jointly advance the healthy and orderly development of photovoltaic applications and manufacturing industries. All towns (streets and districts) must establish and improve corresponding working organizations simultaneously, combine the local conditions, decompose and implement the work plan, formulate specific plans for promotion, and ensure that all work is implemented and effective results are achieved.

Our Solar lights applied in freeway,avenue,pedestrian,garden,campus,path, military bases,park,driving way,airport,boat dock and so on. LED solar street light relies on solar energy, which is clean, endless and environment-friendly. 

The system is mainly composed of solar panel, light source, controller and battery. In daytime, when there is sunshine, the solar panel can convert the solar energy to electric energy and store it in the battery. 

At night or rainy or cloudy condition, the battery shall supply power for normal lighting. The controller can judge the brightness of daylight and automatically switch on the light.The whole process is operating in completely automatic mode, without human action.